Production

Cells for routing, laser, digital cut and print—tied to QA and kitting so finished parts ship retail-ready.

Planning
Project-based production
Quality
Fit and finish checks
Schedule
Confirmed with your quote
Packout
Planned for the shipment
Cells

Automation with accountability.

Work moves through cells that own quality at the source—fewer handoffs, cleaner parts, tighter lead times.

CNC Routing

Nested sheets, clean edges and repeatability. Our 3-router cell runs acrylics, plastics and boards with in-process QA.

CNC machining at POP82.

CO₂ Laser Cutting

Two Camfive 150W lasers for crystal-clear edges, fine details and rapid sampling—minimal post-finish.

Laser cutting at POP82.

Digital Cutting

Kiss/through cuts and creases on boards and films; ideal for packaging prototypes and short runs.

Finished display reference: different product openings and layouts.
Finished display reference: different product openings and layouts.

Large-Format Printing

Roland full-sheet print with device-linked color management for predictable, durable retail visuals.

Print production at POP82.

Fabrication & Bonding

Solvent bonding, heat-bending and assembly fixtures align tolerances for strong, clean constructions.

Finished display reference: clear enclosures with fitted bases.
Finished display reference: clear enclosures with fitted bases.

Finishing & Polish

Flame polish, deburr, surface protection and inspection keep parts shelf-ready out of the box.

Finished display reference: a clear stand supporting a branded product.
Finished display reference: a clear stand supporting a branded product.

Kitting & Packout

Retail-ready kits, protective inserts and compliance labels; ship complete to stores or DCs.

Fulfillment at POP82.

Quality Pipeline

Built to prevent defects, not detect them—quality gates with traceability.

01
Receiving
Verify material, lot & COAs
02
First Article
Fit, finish & spec sign-off
03
In-Process QA
Cells own checks at source
04
Final QC
Random sampling + audit
05
Pack & Label
Kitting, protection, GS1

Materials & Substrates

Acrylic, PETG, polycarbonate, PVC & foams; paperboard and corrugated for packaging; films and protective laminates.

  • Acrylic (PMMA)
  • PETG / PC
  • PVC & Foam
  • Paperboard
  • Corrugated
  • Films & Laminates
Clear sports memorabilia display cases with dark bases in several sizes
Clear enclosures and contrasting bases: a finished display reference for your material discussion.
ISO-style SOPsColor ManagementDevice ProfilingTraceabilityGS1 / Retail Compliance

Three processes. One production team.

CNC machining
Laser cutting
Print production

Need production at speed?

We’ll align specs, yields and lead times—then run the playbook.

Talk fulfillment & logistics

Plan your project

Production at POP82

Display production combines cutting, printing, forming, bonding and finishing according to the approved design. Quantity, material availability, sample approvals and packaging requirements shape the schedule.

Plan samples and repeat production together

For a bulk display manufacturing program, provide the sample quantity and projected production quantities at the same time. Approved drawings, material selection, graphic versions and packaging define what must remain consistent when a run is repeated.

See work from the shop

Explore supplied photographs of acrylic assemblies and production footage, then send the detail you want to discuss with your drawing or sample.

Release a buildable and inspectable configuration

Tie the production request to the approved assembly, part schedule, material and artwork revisions. Identify the critical dimensions and appearance features that must be checked before components are packed or joined permanently.

Plan the first-article review and any exceptions with the team. Production quantity, prototype quantity and spare parts should be recorded separately so the release does not accidentally mix samples with deliverable units.

Plan the run around bulk-order requirements

Bulk orders are a core part of POP82’s production work. Define complete assemblies, component batches and printed variants separately so cutting, fabrication, graphics and packing follow one agreed release. Provide the committed quantity for this run alongside any forecast for later work.

A production discussion should cover the approval reference, inspection requirements and receiving unit as well as the number of pieces. Use the bulk guides to prepare those inputs, then confirm practical quantities and timing with the team.

Before the next step

Questions about your project

Clear answers for planning, approvals and your production brief.

Can a sample and a production run be quoted together?

Yes. Provide the sample quantity, anticipated production quantity and any repeat-order plans. The quote can distinguish design and sample work from the work required for the full run.

How should acceptable finish variation be recorded before a production run?

Identify the surfaces and features that matter, then agree how they will be reviewed. An accepted physical reference, labeled photographs and written criteria can distinguish a visible face from a concealed assembly surface. Confirm the inspection scope with POP82 rather than relying on an undefined instruction such as perfect finish on every part.

What should I flag when customer-supplied hardware will arrive separately?

List the hardware identifier, revision, quantity, supplier and expected arrival date. Explain which production or assembly steps depend on it and whether an earlier sample is available for fit review. Have the team confirm receipt and the effect of any shortage or substitution; a supplier's dispatch notice does not establish that the required hardware is ready for assembly.

Can an approved version be released while another version is still under review?

Request a separate release that names only the approved configuration, file revisions and quantity. Mark the unresolved version as not released, including any parts it shares with the approved work. POP82 must review whether the proposed separation is practical and how it affects the production schedule before either version is treated as ready to run.

What is the first planning step for Production?

For a bulk display manufacturing program, provide the sample quantity and projected production quantities at the same time. Approved drawings, material selection, graphic versions and packaging define what must remain consistent when a run is repeated.

What information helps start a discussion about Production?

Begin with the intended result and the current project status. Identify the part or assembly version to produce, attach the relevant drawing or reference, and separate confirmed requirements from choices still being evaluated.

How can Production help with bulk project planning?

Apply the guidance to each configuration rather than only the total quantity. Record the production sample and inspection reference for the relevant version, then list sample quantities, production units and destination allocations separately.

What approvals help put Production into practice?

Connect the actual specification, artwork and acceptance reference to one revision. Resolve the part or assembly version to produce with the responsible reviewer; a planning guide does not replace approval of the specific job.

What files support a review of Production?

Supply the current drawing, artwork or reference documents and explain what each one establishes. Include the release quantities and packout requirements in the handoff, label incomplete information and avoid sending conflicting revisions without an explanation.

How should alternatives for Production be compared?

Keep the required outcome, quantity and destination scope consistent across the options. Compare the decision about the production sample and inspection reference explicitly so a lower quoted total is not mistaken for an equivalent specification.

What should I know about “release a buildable and inspectable configuration” for production?

Tie the production request to the approved assembly, part schedule, material and artwork revisions. Identify the critical dimensions and appearance features that must be checked before components are packed or joined permanently. Plan the first-article review and any exceptions with the team. Production quantity, prototype quantity and spare parts should be recorded separately so the release does not accidentally mix samples with deliverable units.

What should I know about “plan the run around bulk-order requirements” for production?

Bulk orders are a core part of POP82’s production work. Define complete assemblies, component batches and printed variants separately so cutting, fabrication, graphics and packing follow one agreed release. Provide the committed quantity for this run alongside any forecast for later work. A production discussion should cover the approval reference, inspection requirements and receiving unit as well as the number of pieces. Use the bulk guides to prepare those inputs, then confirm practical quantities and timing with the team.

How should a production traveler distinguish a sample from a deliverable unit?

Give samples a clear purpose and identifier, such as approval, retained reference or testing, and keep their quantities separate from deliverable production units. Record whether a sample is included in the order count. Match those labels to the approval and packing records.

What should happen when two approved files carry the same revision name?

Identify the controlling file using its issue date and an unambiguous filename or document reference, then request a corrected revision record. Do not rely on whichever attachment was opened last. The purchasing, artwork and manufacturing records should point to the same approved version.

How should I describe a first-article hold point in the production brief?

State what must be reviewed, who will approve it and whether work beyond that stage requires an explicit release. Identify the affected items and the evidence expected from the review. Confirm the hold point and its scheduling implications with the team before treating it as part of the production plan.

Should replacement parts keep the identifier of the original assembly?

Reference the original assembly and identify the replacement component separately, including its revision and mating parts. Provide photographs or measurements where the installed condition may differ from the original drawing. A shared project name is not enough to establish that a replacement will fit.

Explore related services and guides

Your next project

Let’s make the brief real.

Share dimensions, quantity, artwork and your target date with our Buena Park team.

POP82 / Privacy

Choose what you share.

The site works with optional services turned off. These settings apply across POP82 and can be changed using the Cookies button at the bottom left or “Cookie settings” in the footer.

Essential preferences

Remember your privacy choice, color theme and accessibility settings. The project planner may also use temporary storage in this tab when you ask to transfer a brief.

Always active

No advertising pixels or third-party analytics provider are included. Your choice is saved for 180 days when browser storage is available. Turning maps off removes the embeds immediately; it cannot undo information already sent to Google or clear Google’s own cookies.